Church Construction Project       




| SLIDE SHOW OF THE CONSTRUCTION |



St ANDREW'S CHURCH CONSTRUCTION UPDATE
Mid-July 2006
Progress continues both inside and outside of the building. In the east side administrative areas, the walls have been textured and painted, ceiling grid and light fixtures have been installed, doors and hardware have been installed and tile is being installed in the bathrooms. In the nave the ceiling sheetrock is being taped, the sprinkler piping has been installed and the tabernacle has been framed. The exterior finishes (EIFS and brick veneer) are underway. Sitework also continues with the south fire lane subgrades completed and sitework will now focus on the north side of the building.
(See slide show below).



 

| Intro Page | St Andrew Home Page | Site Location |
| Parish Planning Study Report (PDF) | Home |
| NEW REVISED - Floor Plan (PDF) | Rendering (PDF) |

Parish "Update" Brochure 2/13/05 (PDF)











Copyright 2002 aksaintandrews.org

ST ANDREW CHURCH - EAGLE RIVER, ALASKA
All Rights Reserved.
Note: These pages are best viewed
with a 4.0 or better browser

Designed and Maintained
by Daily's Web Design
Theresa Daily - E-Mail
http://www.dailyswebdesign.com